PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Sanitary piping at room 175A Facing East (800x600).jpg Sanitary piping at room 175B Facing North (800x600).jpg Unloading shear wall panels onto the 3rd floor for Elev. 1,2,3 Facing South (800x600).jpg Welded extension beam angles at Derrick -3 (2nd Floor) Facing South-East (800x600).jpg Welding beams at Derrick -3 (3rd Floor) Facing East (800x600).jpg
Previous pageNext page Welded extension beam angles at Derrick -3 (2nd Floor) Facing South-East (800x600)
Welded extension beam angles at Derrick -3 (2nd Floor) Facing South-East (800x600)